{"id":24146,"date":"2023-09-18T12:01:55","date_gmt":"2023-09-18T11:01:55","guid":{"rendered":"https:\/\/www.monlife.co.uk\/?p=24146"},"modified":"2023-09-18T12:03:34","modified_gmt":"2023-09-18T11:03:34","slug":"gwaith-yn-dechrau-ar-bont-teithio-llesol-llan-ffwyst-ir-fenni","status":"publish","type":"post","link":"https:\/\/www.monlife.co.uk\/cy\/gwaith-yn-dechrau-ar-bont-teithio-llesol-llan-ffwyst-ir-fenni\/","title":{"rendered":"Gwaith yn dechrau ar bont Teithio Llesol Llan-ffwyst i\u2019r Fenni"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><a href=\"https:\/\/www.monmouthshire.gov.uk\/app\/uploads\/2023\/09\/Active-Travel-bridge-Abergavenny-artist-impression.png\"><img decoding=\"async\" src=\"https:\/\/www.monmouthshire.gov.uk\/app\/uploads\/2023\/09\/Active-Travel-bridge-Abergavenny-artist-impression.png\" alt=\"artist's impression of the new Active Travel bridge linking Abergavenny and Llanfoist\" class=\"wp-image-170782\"\/><\/a><figcaption>Argraff arlunydd o bont Teithio Lesol newydd bydd yn cysylltu \u2018R Fenni a Llan-ffwyst<\/figcaption><\/figure>\n\n\n\n<p>Fel rhan o gyllid Teithio Llesol Llywodraeth Cymru a ddyfarnwyd yn 2023\/24, bydd cam 1 o\u2019r gwaith o adeiladu pont Teithio Llesol Llan-ffwyst i\u2019r Fenni yn dechrau ar ddydd Llun 18 Medi, 2023.<\/p>\n\n\n\n<p>Mae\u2019r gwaith yn cynnwys cloddiau ar gyfer y ramp deheuol yn unig i ddechrau, ar ochr Llan-ffwyst i\u2019r Afon Wysg a bydd yn cymryd tua phedair wythnos i\u2019w gwblhau. Bydd y gwaith sefydlu hwn yn cael ei wneud gan d\u00eem gweithrediadau Cyngor Sir Fynwy. Bydd mynediad i\u2019r banc yn cael ei ganiat\u00e1u.<\/p>\n\n\n\n<p>Bydd y gwaith adeiladu yn cael ei ohirio dros y gaeaf, ac ar \u00f4l hynny bydd yr elfennau sy\u2019n weddill o\u2019r ramp yma, y ramp ar yr ochr ogleddol a phrif strwythur y bont, yn cael eu hadeiladu\u2019r flwyddyn nesaf. Ar hyn o bryd, y bwriad yw cwblhau\u2019r gwaith erbyn Rhagfyr 2024.<\/p>\n\n\n\n<p>Nid yw\u2019r gwaith hwn yn cynnwys unrhyw lwybrau o fewn Dolydd y Castell eleni. Bydd y cais cynllunio ar gyfer llwybrau Dolydd y Castell yn cael ei ystyried yng nghyfarfod cynllunio mis Hydref yng Nghyngor Sir Fynwy.<\/p>\n\n\n\n<p>Am fwy o wybodaeth am gynllun Teithio Llesol Llan-ffwyst i\u2019r Fenni, ewch i:&nbsp;<a href=\"https:\/\/www.monlife.co.uk\/cy\/cwestiynau-cyffredin-dolydd-y-castell\/\">www.monlife.co.uk\/cy\/cwestiynau-cyffredin-dolydd-y-castell\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fel rhan o gyllid Teithio Llesol Llywodraeth Cymru a ddyfarnwyd yn 2023\/24, bydd cam 1 o\u2019r gwaith o adeiladu pont Teithio Llesol Llan-ffwyst i\u2019r Fenni yn dechrau ar ddydd Llun [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-24146","post","type-post","status-publish","format-standard","hentry","category-uncategorized-cy"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/posts\/24146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/comments?post=24146"}],"version-history":[{"count":0,"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/posts\/24146\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/media?parent=24146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/categories?post=24146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.monlife.co.uk\/cy\/wp-json\/wp\/v2\/tags?post=24146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}